The Highway That Almost Was: The History of the Southwest Connector

Introduction: The Concrete Cure for Traffic Strangulation

In the mid-twentieth century, Atlanta city planners viewed asphalt as the ultimate cure for urban growing pains. As the metropolitan population swelled and automobile ownership skyrocketed, the municipal government became obsessed with preventing what politicians ominously referred to as “traffic strangulation.”[1] To keep the city moving, planners proposed a massive, interconnected web of expressways designed to slice directly through existing residential neighborhoods.

One of the most ambitious and ultimately contentious of these proposed routes was the Southwest Connector. Designed to be a high-speed, multi-lane artery, the connector was intended to link Marietta Boulevard in the north directly to the Cascade Avenue and Gordon Road (now Ralph David Abernathy Boulevard) intersection in the south.[2] While it was pitched as a vital infrastructural necessity, the proposed route threatened to bulldoze through the heart of Atlanta’s Black educational and residential institutions. By analyzing municipal bond records, internal mayoral memoranda, and the fierce protests of local civil rights leaders, the history of the Southwest Connector reveals how a grand expressway dream was systematically dismantled by community resistance, ultimately leaving behind the truncated thoroughfare known today as Langhorn Street.


Chapter 1: The Master Plan and the 1955 Warning

While the political battles over the Southwest Connector erupted in the 1960s, the concept for the highway was deeply rooted in the city’s earliest infrastructure plans. According to a 1964 joint memorandum from the city’s planning, construction, and traffic engineering departments, the connector road was actually “first planned during or prior to the second world war.”[3]

The push to finally build the road was accelerated by the rapid failure of Atlanta’s earliest highway experiments. By April 1955, the Atlanta Traffic and Safety Council issued a stark warning that the city’s primary expressway system was “already becoming outmoded.”[4] State Highway Chairman Walter Blasingame pointed out that the central road was originally designed to handle 15,000 vehicles a day, but the traffic count had exploded from 17,963 in January 1953 to a staggering 46,192 cars in January 1955.[5]

Despite this glaring evidence that new highways simply induced more traffic, city planners pushed forward with even larger proposals. Blasingame noted that while $32 million had already been spent on the existing expressway, several major legs were still unprogrammed, explicitly listing the “southwest connector” alongside the east, southeast, and west legs as vital future projects.[6], [7]


Chapter 2: The 1962 Bond Issue and the Threat to Fair Street

The financial foundation for the Southwest Connector was laid during a massive municipal funding push. In July 1962, the Fulton County Commission proposed an $80 million joint city-county bond issue. A marquee item on this list was a new $2,315,000 Southwest Connector, which County Public Works Director Turner McDonald called “the most important project on the county’s list.”[8], [9]

However, the original routing for this 1962 proposal was disastrous for the Black community. The plan called to extend the terminus of the Techwood Viaduct over Northside Drive, widen Fair Street to four lanes, and provide a new four-lane extension from Fair Street Southwest directly to Cascade Avenue.[10] Widening Fair Street would have driven a massive highway directly through the Atlanta University Center, physically splitting the campuses of the historically Black colleges.

The academic and civil rights communities immediately recognized the existential threat. Robert A. Thompson of the Atlanta Urban League and Dick Forbes, the chief planner in the city planning department, fiercely objected to the route. Thompson argued that widening Fair Street would “defeat the dreams of a unified campus for the Atlanta University Center colleges,” suggesting Hunter Street as a less destructive alternative.[11]

The Black community leveraged their immense voting power to protect the universities. The Atlanta Negro Voters League (AVL) and the Westside Voters League threatened to withhold their endorsement of the entire $80 million bond package unless the Fair Street route was scrapped. Facing a total collapse of the city’s infrastructure funding, Mayor Ivan Allen Jr. and county officials called an emergency meeting at the Central Branch YMCA on July 17, 1962.[12] The meeting was attended by a powerhouse delegation of Black leaders, including Dr. Benjamin E. Mays, A.T. Walden, C.R. Yates, T.M. Alexander, and Rev. William Holmes Borders.[13]

The political hardball worked. The AVL secured a “firm commitment” from the city that the Fair Street portion of the Southwest Connector would be completely abandoned.[14] With the campuses saved, the Black voters leagues officially endorsed the bond issue, reminding their constituents on election day that “Fears that Fair Street would be tampered with in connection with the proposed Southwest Connector have been abated by a commitment to the Voters League that this will not happen.”[15]


Chapter 3: The 1963 Redesign and the Western Bypass

With the Fair Street route abandoned, city engineers were forced to shift the highway further west. In the spring of 1963, the city unveiled the redesigned Southwest Connector. The new plan called for a $1,700,000 four-lane roadway to be built between the Cascade Road and Gordon Road area and the four-lane Marietta Boulevard, including a major interchange with the new Atlanta-Birmingham Interstate Highway (I-20) that was under construction.[16]

The revised route was intended to relieve the serious traffic problems on Northside Drive.[17] However, the highway was also intended to serve as a hard, physical boundary for future city planning. In April 1965, Earl Metzger, the Atlanta Housing Authority director of redevelopment, officially designated the proposed Southwest Connector as the western boundary line for the massive 14.5-acre West End urban renewal project, utilizing the unbuilt highway to define the limits of their slum clearance efforts.[18]

The city’s vision for this corridor was staggering in its scope. According to a comprehensive planning report published in October 1965, the Southwest Connector was not just a standalone highway; it was designed to be the western anchor of a massive “inner loop” that would encircle the southern half of the city.[19] Planners proposed connecting University Avenue to a White Street extension at Lee Street with a grade separation and interchange at Lee, Murphy Avenue, and the Georgia Railroad.[20] This $2.6 million project was explicitly designed as “a section of the inner loop to eventually connect the Southwest Connector to Boulevard, an east-west tie on the south side of the Central Business District.”[21]

The ultimate ambition for the Southwest Connector was revealed in December 1968 by the Atlanta Area Transportation Study (AATS). Planners proposed re-building the Brookwood Interchange to continue Interstate 85 southward on the west side of the downtown area to link directly with the programmed Southwest Connector.[22] This massive undertaking would have given Atlanta two north-south expressways out of downtown, transforming the Southwest Connector into a major interstate bypass.[23]


Chapter 4: The Westview Protests and the L&N Railroad

While the universities had been saved by the 1963 redesign, the new route still threatened vital Black residential neighborhoods. As urban historians have noted, existing rail infrastructure frequently became an attractive source of right-of-way for midcentury highway planners. Because railroads already carved predefined paths through cities, planners utilized them to route freeways, believing it would minimize the destruction of residential blocks.[24] This exact strategy was deployed for the Southwest Connector. The proposed alignment generally followed the Louisville and Nashville (L&N) Railroad right-of-way, slicing directly through established communities.

In a confidential October 1964 memorandum to Mayor Ivan Allen Jr., city planners Wyont Bean, Ray Nixon, and Karl Bevins detailed the restrictive geography of the route. They noted that recent apartment developments near Simpson Road, the underpass at Westview Drive, and the ramps of the West Expressway (I-20) severely limited their options. The planners narrowed the route to two alternatives: running entirely along the east side of the L&N Railroad from Cascade to Marietta Boulevard, or bridging over the railroad north of Westview Drive to run along the west side before recrossing north of Bankhead Avenue. The planners favored these routes because the railroad “presently forms the boundary line of several neighborhoods,” arguing that to “vary away from the railroad would further split and destroy the unity of adjacent neighborhoods.”[25]

However, the residents living along this boundary fiercely disagreed. In September 1964, Alderman Jack Summers and Fulton County Public Works representative Mr. McGeorge met with residents of Westview Drive, Lawton Street, and the L&N Railroad area. The homeowners were furious, arguing that the project “would destroy the neighborhood they had worked so hard to develop.”[26]

Engaging in what historians term “competitive activism” (attempting to shift the highway’s burden to a different area rather than canceling it entirely), the residents demanded alternatives.[27] They suggested the city align the roadway with Ashby Street, develop an elevated roadway directly over the L&N Railroad, or eliminate that section of track entirely. Another suggestion was to route the highway along the west side of the railroad rather than the east.[28]

On September 22, 1964, a delegation of approximately twenty-five residents from Westview Drive, Fountain Drive, and Hunter Place marched into a meeting with the city planners. Led by a powerhouse of local leadership, including Senator LeRoy Johnson, Mr. and Mrs. G.L. Chandler, and Mr. M.L. Goss, they formally requested the city relocate the facility.[29]

The city bluntly rejected the community’s demands. The planners calculated that an alignment along the west side “will effect approximately twice as many families and will require three major crossings of rail facilities while the general location along the east side will effect fewer families and require the crossing of only one rail facility.”[30] The city also rejected the Ashby Street alternative, noting that Ashby was already slated for its own future widening. Furthermore, eliminating the L&N tracks was deemed impossible due to the “large number of industries and commercial activities that require railroad for supply,” and an elevated roadway was dismissed as a massive engineering expense. Ultimately, the city concluded it “would not be to the cities best interest in requesting a change in the general alignment.”[31]

The highway project also threatened the city’s recreational spaces. In June 1967, City of Atlanta Parks Department Director Jack C. Delius and members of the Atlanta Parks Committee officially petitioned the State Highway Department to divert the Southwest Connector from its planned course.[32] Delius pointed out that the highway, as it was currently planned, would run directly through the Washington Park tennis center, destroying a vital recreational amenity for the Black community. He estimated it would cost the city up to $200,000 to replace the courts.[33]

The response from the state highlighted the ruthless pragmatism of highway construction. State Highway Director Jim Gillis bluntly dismissed the parks department’s concerns. “What the city fails to realize is that it received a lot of funds from the doing of a highway,” Gillis stated, suggesting the city simply relocate the tennis center or close it entirely if necessary.[34] The threat to the park lingered for years; in August 1970, local reports noted that while the Washington Park Tennis Center was undergoing repairs, the proposed roadway for the Southwest Connector still went “right through the tennis center.”[35]


Chapter 5: Legal Battles and the Central Area Study

Faced with relentless opposition from civil rights leaders, neighborhood delegations, and even their own parks department, the municipal government found it nearly impossible to secure the necessary land. By May 1964, Fulton County Manager Alan F. Kiepper reported to the commissioners that the acquisition of right-of-ways for the Southwest Connector was causing a “major bottleneck” that was severely delaying the entire $15 million county bond program.[36], [37] Kiepper noted that the clearing of titles was delayed due to the large number of parcels involved and the complex searching of property titles that had changed hands many times.[38]

The highway’s path also triggered intense legal battles over local zoning. In September 1967, Planning Director Collier Gladin wrote an urgent memo to Alderman John Flanigen, Chairman of the Zoning Committee, regarding the “Dan Williams court case” involving property at Greenwich Street and the Southwest Connector. The court had ruled unfavorably against the city’s zoning interests in the area. Gladin strongly urged the city to appeal the decision, warning that the ruling threatened the integrity of the West End Urban Renewal Project Area and would negatively influence “other properties similarly located along the Southwest Connector.”[39] The highway was no longer just a transportation issue; it was a legal liability destabilizing the city’s broader urban renewal efforts.

As the delays and legal battles mounted, the broader philosophy of urban planning in Atlanta began to shift. Planners slowly realized that carving massive expressways through the heart of the city was destroying the urban fabric. This realization was formalized in December 1971 with the publication of the Central Area Study. The comprehensive report heavily criticized the existing central area street system as a “chaotic melange of discontinuous roads, un-related and short one-way streets, odd intersections caused by changes in the street grid, and street widths which vary with little relationship to traffic demands.”[40]

To solve this, the study recommended abandoning the grand visions of new expressways and instead focusing on “street improvements” to “normalize the street system.”[41] The study explicitly proposed downgrading the Southwest Connector project, recommending only the extension of Langhorn Street from Oak Street to Ralph David Abernathy Boulevard (Gordon Street), and the extension of Oak Street from Langhorn Street to Ashby Street.[42] The grand vision of a high-speed artery linking Marietta Boulevard to Cascade Road was officially dead.


Conclusion: The Langhorn Legacy and the Money Running Out

While the full, high-speed expressway envisioned in the 1963 master plan was never fully realized due to the relentless community pushback, a truncated portion of the project was completed. In March 1966, Fulton County officials proudly noted that the “Langhorn Street section of Southwest Connector” was moving toward completion as part of the 1963 Progress Bond Issue.[43] By June 1967, the county manager confirmed that the Southwest Connector from Gordon Street to Interstate 20 on the north was “complete and in use,” while the rest of the connector toward Cascade and Campbellton Roads remained under construction.[44]

The ultimate fate of the northern section of the highway was revealed in a starkly pragmatic exchange in the April 6, 1970, edition of The Atlanta Constitution’s “Action Line” column. A resident wrote in to ask when the short length of the Southwest Connector between the I-20 exit and Maddox Park would finally be tied together so traffic could reach Marietta Boulevard.[45] The newspaper’s response was blunt: “It’ll be a while. Fulton County tells us that the road runs out because the money ran out.”[46] Public Works Director Turner McDonald confirmed that it would take an entirely new bond issue before the connector could be finished, an issue that was not expected anytime soon.[47]

With the grand expressway abandoned, the city’s Traffic and Transportation Commission was forced to manage the resulting congestion through minor street improvements. Archival records from Mayor Ivan Allen Jr.’s administration reveal that the city eventually resorted to basic “channelization to reduce hazards” and “minor widening” on Langhorn Street and White Street to handle the traffic flow.[48]

Today, Langhorn Street SW serves as a primary exit off Interstate 20. However, it is not the massive, city-slicing artery that midcentury planners envisioned. Because the highway was never completed, Langhorn Street exists today as an overbuilt, underutilized remnant of a failed infrastructure project. To the south, it connects drivers to Ralph David Abernathy Boulevard, Cascade Avenue, and White Street, providing a primary exit for the Westview neighborhood. To the north, the route abruptly ends at Westview Drive SW, leaving the grand connection to Marietta Boulevard permanently severed because, as the county bluntly admitted in 1970, the money ran out. For the residents of Southwest Atlanta, this truncated street stands as a concrete monument to the era when the community successfully fought back against the bulldozers to save their schools, their parks, and their universities.

Footnotes & Citations (Click to Expand)
Citations:
  1. “BONDS’ AIM TO PREVENT ‘TRAFFIC STRANGULATION’,” The Atlanta Journal, May 9, 1963, 1. ↑
  2. “Bonds Aid Traffic,” The Atlanta Journal, May 9, 1963, 32. ↑
  3. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  4. “Expressway ‘Is Becoming Outmoded’,” The Atlanta Constitution, April 20, 1955, 1. ↑
  5. “Expressway ‘Becoming Outmoded’,” The Atlanta Constitution, April 20, 1955, 8. ↑
  6. “Expressway ‘Becoming Outmoded’,” The Atlanta Constitution, April 20, 1955, 8. ↑
  7. “City Growth Outpaces Expressway’s Progress,” The Atlanta Constitution, April 22, 1955, 4. ↑
  8. “20 Highway, Street Projects In Proposed $80-Million Bond Issue,” Atlanta Daily World, July 11, 1962, 2. ↑
  9. “Voters League Names Committee To Study $80 Million Bond Plan,” Atlanta Daily World, July 15, 1962, 1. ↑
  10. “20 Highway, Street Projects In Proposed $80-Million Bond Issue,” Atlanta Daily World, July 11, 1962, 2. ↑
  11. “Voters League Names Committee To Study $80 Million Bond Plan,” Atlanta Daily World, July 15, 1962, 1. ↑
  12. “Leaders Confer With Mayor; Pledge Strong Support In Bond Vote,” Atlanta Daily World, July 18, 1962, 1. ↑
  13. “Leaders Confer With Mayor; Pledge Strong Support In Bond Vote,” Atlanta Daily World, July 18, 1962, 1. ↑
  14. “Two Meetings This Week On Bond Issue,” Atlanta Daily World, July 24, 1962, 1. ↑
  15. “Vote For The Bond Issue Today,” Atlanta Daily World, August 2, 1962, 6. ↑
  16. “Traffic Improvements Top Fulton County Bond Program,” Atlanta Daily World, April 26, 1963, 2. ↑
  17. “Traffic Improvements Top Fulton County Bond Program,” Atlanta Daily World, April 26, 1963, 2. ↑
  18. “Huge Renewal Project Speeded for West End,” The Atlanta Constitution, April 23, 1965, 9. ↑
  19. “Plans Exist for a Magic Change,” The Atlanta Journal and the Atlanta Constitution, October 31, 1965, 41. ↑
  20. “Plans Exist for a Magic Change,” The Atlanta Journal and the Atlanta Constitution, October 31, 1965, 41. ↑
  21. “Plans Exist for a Magic Change,” The Atlanta Journal and the Atlanta Constitution, October 31, 1965, 41. ↑
  22. “New Transit Path Annoys Southside,” The Atlanta Constitution, December 16, 1968, 10. ↑
  23. “New Transit Path Annoys Southside,” The Atlanta Constitution, December 16, 1968, 10. ↑
  24. Sam Randa, “The Role of Rail in Highway Revolts,” Worcester Polytechnic Institute, 2024, 13. ↑
  25. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  26. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  27. Sam Randa, “The Role of Rail in Highway Revolts,” Worcester Polytechnic Institute, 2024, 21. ↑
  28. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  29. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  30. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  31. Wyont B. Bean, Ray Nixon, and Karl Bevins, “Memorandum: The Alignment of the Southwest Connector,” October 5, 1964, Ivan Allen Jr. Mayoral Records, Box 1, Folder 1. ↑
  32. “Divert Connector, Parks Chief Asks,” The Atlanta Journal, June 7, 1967, 49. ↑
  33. “Divert Connector, Parks Chief Asks,” The Atlanta Journal, June 7, 1967, 49. ↑
  34. “Divert Connector, Parks Chief Asks,” The Atlanta Journal, June 7, 1967, 49. ↑
  35. “Arrington has Dept. repair tennis center,” The Atlanta Voice, August 16, 1970, 9. ↑
  36. “RIGHT-OF-WAYS CAUSE BOTTLENECK,” The Atlanta Journal, May 21, 1964, 2. ↑
  37. “Delay Here On Right of Way Told,” The Atlanta Constitution, May 21, 1964, 17. ↑
  38. “Delay Here On Right of Way Told,” The Atlanta Constitution, May 21, 1964, 17. ↑
  39. Collier B. Gladin, “Memorandum: Rezoning Petition #Z-66-239-E Simpson Road,” September 6, 1967, Ivan Allen Jr. Mayoral Records, Box 13, Folder 8. ↑
  40. “A Plan to Make Atlanta More Mobile,” The Atlanta Journal, December 13, 1971, 16. ↑
  41. “A Plan to Make Atlanta More Mobile,” The Atlanta Journal, December 13, 1971, 16. ↑
  42. “A Plan to Make Atlanta More Mobile,” The Atlanta Journal, December 13, 1971, 16. ↑
  43. “BUILDING… for a better tomorrow,” The Atlanta Journal, March 6, 1966, 175. ↑
  44. “Fulton Nears Bond Wrap Up,” The Atlanta Journal, June 25, 1967, 28. ↑
  45. “ACTION LINE,” The Atlanta Constitution, April 6, 1970, 1A. ↑
  46. “ACTION LINE,” The Atlanta Constitution, April 6, 1970, 2A. ↑
  47. “ACTION LINE,” The Atlanta Constitution, April 6, 1970, 2A. ↑
  48. Ivan Allen Jr. Mayoral Records, Box 18, Folder 18, Document 11. ↑
Comprehensive Bibliography (Click to Expand)
  • Atlanta Daily World. “20 Highway, Street Projects In Proposed $80-Million Bond Issue.” July 11, 1962, 2.
  • Atlanta Daily World. “Business League Backs Officials In ‘Buffer’ Row.” September 18, 1952, 1.
  • Atlanta Daily World. “Fulton Okays Contracts For Bond Projects.” June 11, 1963, 1.
  • Atlanta Daily World. “Leaders Confer With Mayor; Pledge Strong Support In Bond Vote: Univ. Center Presidents Get Fair Street Promise.” July 18, 1962, 1.
  • Atlanta Daily World. “Second Mass Meeting In 2 Nights To Hear Bond Proposals At Rally Tonight At Wheat Street Church.” July 27, 1962, 1.
  • Atlanta Daily World. “The Question Of A ‘Buffer’.” September 18, 1952, 6.
  • Atlanta Daily World. “Traffic Improvements Top Fulton County Bond Program.” April 26, 1963, 2.
  • Atlanta Daily World. “Two Meetings This Week On Bond Issue.” July 24, 1962, 1.
  • Atlanta Daily World. “Vote For The Bond Issue Today.” August 2, 1962, 6.
  • Atlanta Daily World. “Voters League Names Committee To Study $80 Million Bond Plan.” July 15, 1962, 1.
  • Ivan Allen Jr. Mayoral Records. Box 1, Folder 1. “Memorandum: The Alignment of the Southwest Connector.” October 5, 1964.
  • Ivan Allen Jr. Mayoral Records. Box 13, Folder 8. “Memorandum: Rezoning Petition #Z-66-239-E Simpson Road.” September 6, 1967.
  • Ivan Allen Jr. Mayoral Records. Box 18, Folder 18, Document 11.
  • Ivan Allen Jr. Mayoral Records. Box 20, Folder 33, Document 62.
  • Randa, Sam. “The Role of Rail in Highway Revolts.” Worcester Polytechnic Institute, 2024.
  • The Atlanta Constitution. “6 Zoning Changes Approved.” September 6, 1968, 24.
  • The Atlanta Constitution. “ACTION LINE.” April 6, 1970, 1A.
  • The Atlanta Constitution. “ACTION LINE.” April 6, 1970, 2A.
  • The Atlanta Constitution. “City Growth Outpaces Expressway’s Progress.” April 22, 1955, 4.
  • The Atlanta Constitution. “Delay Here On Right of Way Told.” May 21, 1964, 17.
  • The Atlanta Constitution. “Expressway ‘Becoming Outmoded’.” April 20, 1955, 8.
  • The Atlanta Constitution. “Expressway ‘Is Becoming Outmoded’.” April 20, 1955, 1.
  • The Atlanta Constitution. “Fulton Asks Dr. Mays’ Help To Meet Road Plan Objections.” July 14, 1962, 3.
  • The Atlanta Constitution. “Huge Renewal Project Speeded for West End.” April 23, 1965, 9.
  • The Atlanta Constitution. “New Transit Path Annoys Southside.” December 16, 1968, 10.
  • The Atlanta Constitution. “Realtor Charges Search Again Made For ‘Scapegoat’ in Housing of Negroes.” December 28, 1962, 4.
  • The Atlanta Journal. “A Plan to Make Atlanta More Mobile.” December 13, 1971, 16.
  • The Atlanta Journal. “BONDS’ AIM TO PREVENT ‘TRAFFIC STRANGULATION’.” May 9, 1963, 1.
  • The Atlanta Journal. “Bonds Aid Traffic.” May 9, 1963, 32.
  • The Atlanta Journal. “BUILDING… for a better tomorrow.” March 6, 1966, 175.
  • The Atlanta Journal. “Divert Connector, Parks Chief Asks.” June 7, 1967, 49.
  • The Atlanta Journal. “EXPRESSWAY PROJECTS SHARE IN BOND PROGRAM.” July 11, 1962, 1.
  • The Atlanta Journal. “Fulton Nears Bond Wrap Up.” June 25, 1967, 28.
  • The Atlanta Journal. “Fulton Outlines Bond Plans, Slates Review Hearings.” March 3, 1963, 7.
  • The Atlanta Journal. “Negroes Ask Fulton To Relocate Road.” October 8, 1964, 2.
  • The Atlanta Journal. “RIGHT-OF-WAYS CAUSE BOTTLENECK.” May 21, 1964, 2.
  • The Atlanta Journal and the Atlanta Constitution. “Plans Exist for a Magic Change.” October 31, 1965, 41.
  • The Atlanta Voice. “Arrington has Dept. repair tennis center.” August 16, 1970, 9.

Last revised:

Share Your History

History lives in the memories of the people who experienced it. Did you shop at these stores or spend time in these neighborhoods? Share your personal stories and memories below to add to this archive.

Leave a Reply

Your email address will not be published. Required fields are marked *

Explore The Archive

  • Before the concrete and carillons of Greenbriar Mall covered the landscape, the tract at Campbellton Road and the Perimeter Highway was home to the Black Rock Country Club and later the Meadowbrook Country Club.

  • Opened in 1965 as a massive, 700,000-square-foot enclosed mall, Greenbriar Shopping Center brought revolutionary John Portman architecture and premier retail anchors to Southwest Atlanta.

  • A fearless political pioneer and federal whistleblower, Henrietta Mathis Canty broke barriers in the Georgia General Assembly and fought relentlessly for civil rights, fair housing, and the protection of Black ancestral lands.